Skip to main content

Time Control Permissions

Time Control​

192. Estimated costs: If you activate this permission, both in the View option and in the Edit option, the option to calculate the estimated costs of shifts is enabled.

Estimated costs

7. Time Control Templates: If you activate this permission, in the View option, they can view and use shift templates. In the Edit option, it is enabled that the user can also create and modify them.

Time Control Templates

81. Automatic Shifts: If you activate this permission, in the Edit option, the user can see the automatic shifts option. To use it, they must have the budgets permission activated.

Automatic Shifts