Operational Shifts KPIs Integration
Through the Operational Shifts KPIs Integration settings you can manage from time control how much staff we need to cover a complete shift in a certain zone. (see time control section).
Modify KPI​
- Open the application menu.
- In the Settings section click on General and then on Operational Shifts KPIs Integration.
- In KPI type, select the KPI type. If you activate Allow budgets, the value must be a percentage for correct functioning in budgets.
- Finally click on MODIFY KPI.
Assign KPIs​
- Open the application menu.
- In the Settings section click on General and then on Operational Shifts KPIs Integration.
- In assign KPIs, select the zone where you want to assign the KPIs.
- Select the month and year in which you want to apply them.
- A table will appear where you can edit the KPIs. It works as if you were using excel, you can copy and paste data.
- If you want to copy the table to paste it in an external editor, click on the Copy Table button.
- Finally click on Save Table.